Solar & Battery

Power you actually use, stored for when you need it.

System design starts with twelve months of your actual usage, not a brochure figure. Rooftop solar, battery storage and the switchboard work to support it.

Rooftop solar array on a Sydney tile roof
How we size a system

Usage first, hardware second.

01

Usage first

We look at twelve months of bills and interval data before recommending anything.

02

Roof and switchboard check

Orientation, shading, roof condition and whether the board needs upgrading.

03

System design

Array layout, inverter and battery sizing, with the numbers behind it.

04

Install and commission

Panels set out square, cabling run clean, system commissioned and monitored.

Recent installs

On Sydney roofs.

Get in touch

Need a sparky who turns up?

Call Get a Quote